    Fast-Track Project Scheduling When You Need It

    At Energy Air, we don’t shy away from challenges. In fact, we’ve gained a reputation for being able to rise to the occasion when tight schedules and strict guidelines apply. Whether we’re installing a new system in a school over the short summer break, or working 12 hours a day to complete a large-scale project in a matter of weeks, we’ll complete the job on time or with room to spare. If you have a deadline, we can meet it.

    Our strategic approach to scheduling involves the following:

    – Review of critical-path line items
    – Development of a procurement schedule identifying all lead items for equipment and material
    – Development of a site-specific safety plan
    – Development of a site logistics plan for deliveries and trade overlaps
    – Generation of a project task analysis for scheduling manpower
    – Prefabrication as needed to benefit the efficiency of on-site installation
    – Development of a quality control plan for all project areas

    Fast-Track Projects

    While most construction projects today have quick-moving schedules, here are some fast-track projects we’ve completed that are worth noting:

    Digital Risk Call Center Expansion

    We were roughed in to meet the project schedule in just five weeks for this 55,000-square-foot call center, and we finished installation of the 16 rooftop-unit mechanical system in just 8 weeks.

    Community Health Center Administrative Building

    Demolished existing HVAC equipment and installed four rooftop units, six exhaust curbs and medium and low-pressure ducts all within an aggressive 3-week schedule.

    Wyndham Grand Hotel Orlando Bonnet Creek

    Our team set 15 rooftop units in one day, meeting the final construction schedule after overcoming many project challenges.

    Erwin Technical Institute

    We worked 24/7 over the span of two months, with over 40 men on each 12-hour shift to complete the 95,000-square-foot, Phase I schedule for this project.

    CKS Packaging Plant

    Quick-start, fast-track construction project with a 24/7 work schedule for Phase I.

    Triton Network Systems

    Conception to CO in 60 days.

    CNA Insurance

    70,000-square-foot, full TI turned over to the owner in 12 weeks.

    Warner Bros Store

    31-day goal. CO received in 29 days.

    Starwood Offices

    Approximately 80,000 square feet turned over to the owner in 16 weeks.

    Piano Man Building Renovation

    41-day renovation project that was reduced to 17 days of construction time.

    Tight Schedule? No Problem.

    We pride ourselves on our ability to complete projects thoroughly and efficiently, despite strict time constraints and unexpected obstacles. When you need a job done quickly, we’ll dedicate ourselves to the project day-in and day-out so you can stay on track with your construction schedule. To learn more about our fast-track scheduling, contact us any time!